The table below details the calculated flow rate at specific heads for the 8 panel tracking array system.
|
Grundfos Tracking Solar Panel Array with Grundfos Solar Pump |
|
|
8 Panel Tracking Array |
|
Model |
SQF5A-3N |
SQF5A-6N |
SQF2.5-2N |
SQF1.2-2N |
SQF0.6-2N |
|
Head |
|
|
|
|
|
|
10m |
65000 |
|
|
|
|
|
15m |
|
45000 |
|
|
|
|
20m |
|
33500 |
|
|
|
|
25m |
|
|
27000 |
|
|
|
28m |
|
|
26500 |
|
|
|
30m |
|
|
25500 |
|
|
|
35m |
|
|
23900 |
|
|
|
40m |
|
|
22000 |
|
|
|
45m |
|
|
20000 |
|
|
|
50m |
|
|
18000 |
|
|
|
55m |
|
|
16200 |
|
|
|
60m |
|
|
14500 |
|
|
|
65m |
|
|
12400 |
|
|
|
70m |
|
|
|
11300 |
|
|
75m |
|
|
|
11000 |
|
|
80m |
|
|
|
10600 |
|
|
85m |
|
|
|
10000 |
|
|
90m |
|
|
|
9700 |
|
|
95m |
|
|
|
9200 |
|
|
100m |
|
|
|
8500 |
|
|
105m |
|
|
|
8000 |
|
|
110m |
|
|
|
7500 |
|
|
115m |
|
|
|
6800 |
|
|
119m |
|
|
|
|
5800 |
|
|
|
|
|
|
|
|
Flow rates above are in L/Day for January at Glen Innes |
|
|
|
|
|
|
|
The image above shows the tracking array cylinder mounted on the tracker.

The image above shows a view from below the panels and tracking cylinder.

Grundfos solar tracking array being assembled and tested in our
factory under controlled conditions.
